Page 5 - 2026KINLIN Categories(web-跨頁)
P. 5

Process of T10 Manufacture



 --The flow chart of custom rims



 RAW   Strictly control material quality.      FINISHING
 MATERIAL  Material formula specifically
 adjusted for rims.
                                          anodizing, powder coating...



 Preheat small column for about
 EXTRUSION  4-5  hours,  extrude  through   EXTRA WORKINGS
 molds  make  long  aluminum
 stick.
                                     CNC machining, side brush, safety
                                     indicator, eyelets,
 Round aluminum stick into 3 or      decal install...
 ROUNDING  2 combine pieces of rim then

 cut into individual rims.



 Pin & sleeve joint, firstly press
 one side to fix the pins. Joint
 JOINTING  the rim then press the other
 side to make sure the rim joint         FINISHED PRODUCT
 steadily.



 COLD WORKING  Specific mold and roller wheels.
 (FORMING)  Roll each rim two times.





 ARTIFICIAL   In 180℃ for 8 hours. Cool off
 AGING  with big fans.
 (HEAT TREATMENT)                                           PACKING





 HOLE   Standard/ Custom
 PUNCHING/  Avarage, paired, triple cluster,
 DRILLING  angle/ size of spoke hole.





 2                                                                                                3
   1   2   3   4   5   6   7   8   9   10