Process of T10 Manufacture
--The flow chart of custom rims
RAW Strictly control material quality. FINISHING
MATERIAL Material formula specifically
adjusted for rims.
anodizing, powder coating...
Preheat small column for about
EXTRUSION 4-5 hours, extrude through EXTRA WORKINGS
molds make long aluminum
stick.
CNC machining, side brush, safety
indicator, eyelets,
Round aluminum stick into 3 or decal install...
ROUNDING 2 combine pieces of rim then
cut into individual rims.
Pin & sleeve joint, firstly press
one side to fix the pins. Joint
JOINTING the rim then press the other
side to make sure the rim joint FINISHED PRODUCT
steadily.
COLD WORKING Specific mold and roller wheels.
(FORMING) Roll each rim two times.
ARTIFICIAL In 180℃ for 8 hours. Cool off
AGING with big fans.
(HEAT TREATMENT) PACKING
HOLE Standard/ Custom
PUNCHING/ Avarage, paired, triple cluster,
DRILLING angle/ size of spoke hole.