Page 4 - 2023KINLIN catalog
P. 4
Process of T10 Manufacture
--The flow chart of custom rims
RAW Strictly control material quality.
MATERIAL Material formula specifically
adjusted for rims.
Preheat small column for about
EXTRUSION 4-5 hours, extrude through
molds make long aluminum
stick.
Round aluminum stick into 3 or
ROUNDING 2 combine pieces of rim then
cut into individual rims.
Pin & sleeve joint, firstly press
one side to fix the pins. Joint
JOINTING the rim then press the other
side to make sure the rim joint
steadily.
COLD WORKING Specific mold and roller wheels.
(FORMING) Roll each rim two times.
ARTIFICIAL In 180℃ for 8 hours. Cool off
AGING with big fans.
(HEAT TREATMENT)
HOLE Standard/ Custom
PUNCHING/ Avarage, paired, triple cluster,
DRILLING angle/ size of spoke hole.
2